Left arrow Mur Lura

Government Notices published in Govt. Gazette No. 19,369 of 16 January 2015

Date Icon 01/01/2015

No. 26

PUBLICATION OF BILLS IN SUPPLEMENT

IT is notified for general informationthat the following Bills are published in the Supplement of this Gazette:
Bill No. 82 entitled the Various Laws(Persons with Disability) (Membership in Various Entities) Act, 2015;
Bill No. 83 entitled the Civil Protection(Amendment) Act, 2015;
Bill No. 84 entitled the Local Councils(Amendment) Act, 2014; and
Bill No. 85 entitled the Criminal Code(Amendment) Act, 2015.
16 Jannar 2015

No. 27

Ġieħ ir-Repubblika Act

Cap. 251

Recognitionof the Conferment of a Medal
IT is hereby notified that in accordancewith Article 29 (1) of the Ġieħ ir-Repubblika Act, the President of Malta,acting on the advice of the Prime Minister, has approved the recognition of theconferment of the Medal of the President of the Slovak Republic to Mr GodwinEdward Bencini.
19 April 2013

No. 28

MINISTRY FOR SOCIAL DIALOGUE, CONSUMER AFFAIRS AND CIVIL LIBERTIES

Appointmentof Substitute Member on the Civil Society Committee
IN terms of Article 4 (1) c (i) of theMalta Council for Economic and Social Development Act, the Prime Minister hasapproved the nomination of Ms Annalisa Schembri as Substitute Member  of the Civil Society Committee. Thisappointment is valid until 3rd June, 2016.
16 Jannar 2015

No. 29

MINISTRY FOR SOCIAL DIALOGUE, CONSUMER AFFAIRS AND CIVIL LIBERTIES

Appointmentof Member and Substitute Member on the Gozo Regional Committee
IN terms of Article 6A of the MaltaCouncil for Economic and Social Development Act, the Prime Minister hasapproved the appointment of Mr Jonathan Mintoff and Mr Shaun Azzopardi, asMember and Substitute Member respectively, on the Gozo Regional Committee,representing the Gozo University Group (GUG). These appointments are validuntil 3rd June, 2016.
16 Jannar 2015

No. 30

TERMINATION OF AGRICULTURAL LEASE

THE following declaration, made by thePresident of Malta, is published in terms of the Agricultural Leases(Reletting) Act, 1967.
Declaration BYthe President of Malta
I hereby declare that the undermentionedland, which is Government property,  isrequired for a public purpose in accordance with the provisions of theAgricultural Leases (Reletting) Act, 1967.
Description of the Land
The following land in Birżebbuġa:
A plot of land of the area of about 4,050square metres, bounded on the North, West and East by Government property.
The abovementioned land is shown marked inblue on plan P.D. 2012_687_1, which may be seen on demand at the LandDepartment, Auberge de Baviere, Valletta.
(Sgd) Marie-Louise Coleiro Preca
President
31 Diċembru 2014

No. 31

ACQUISITION OF LAND

THE followingdeclaration made by the President of Malta under article 3 of the LandAcquisition (Public Purposes) Ordinance (Chapter 88) is published in terms andfor the purposes of section 9(1) thereof.
Declaration OF the President of Malta
Whereas by theDeclaration of the Governor General dated 25th April, 1974, published in theGovernment Gazette of the 3rd May, 1974 under Government Notice No. 325, theGovernor General had declared the land, including 2 structures, a room, a newincomplete building and half the width of an alley, measuring 7 Tomniet, 1Siegħ and 2 Kejliet (8093.7 square metres), bounded on the West by propertyof  the Noble Chev. Alexander ApapBologna, on the South by Triq tal-Ħlas and on the West by property of Mr JohnCilia, is required by the competent authority for a public purpose inaccordance with the provisions of the Land Acquisition (Public Purposes)Ordinance (Cap. 88) and whereas this land is no longer so required, I herebydeclare for all intents and purposes of law, that the undermentioned land is nolonger required by the competent authority for a public purpose in accordancewith the provisions of the aforementioned Ordinance.
Description of the Land
The following land ĦalQormi:-
A plot of land measuringabout 870 square metres, bounded on the North and South Eastby property of Joseph Zammit and on the West by property of the Noble Chev.Alexander Apap Bologna.
The abovementioned landis shown marked in red and as plot No. 20E_2 on plan P.D.336_73_B_7, which maybe viewed on demand at the Land Department, Auberge de Baviere, Valletta.
(Sgd) Marie-Louise Coleiro Preca
President
31 Diċembru 2014

No. 32

APPOINTMENT OF THE ORNIS COMMITEE

BY virtue of the powers conferred by article 10(2) of the Conservation ofWild Birds Regulations, the Minister for Sustainable Development, theEnvironment and Climate Change notifies that the Ornis Committee for 2015 iscomposed as follows:
Chairman
Prof. Mark Anthony Falzon
Members
Ms Emeline Fenech
Mr Gwido Baldacchino
Mr Marco Falzon
Mr Lino Farrugia
Mr Joe Perici Calascione
Mr Stephen Saliba
Mr Geoffrey Saliba
Mr Nicholas Barbara
Mr Mark Gauci
Mr Frank Vassallo
Secretary
Mr Sergei Golovkin
09 Jannar 2015

No. 33

FISCAL RESPONSIBILITY ACT

CAP. 534

Fiscal Council
It is notified for general information that inexercise of the powers conferred by Article 48 of the Fiscal Responsibility Act(Cap. 534), the Minister for Finance has appointed the following persons asMembers of the Fiscal Council for a period of four years with effect from 1stJanuary 2015.
Chairperson
Mr René Saliba, BA (Hons) (Econ.) (Melit.), ACIB
Members
Mr Ian Cassar, BCom (Hons) (Econ.) (Melit.), MSc (Econ.) (Edin.), PhD(Heriot-Watt)
Mr Carl Camilleri, BA (Hons) (Econ.) (Melit.), MSc (Econometrics) (Lond.)
16 Jannar 2015

No. 34

APPOINTMENT OF ACTING CLERK TO THE HOUSE OF REPRESENTATIVES

THE Clerk to the House of Representativeshas approved the following acting appointment:–
NAME                                      POST                                                       DEPARTMENT                        DATE
Mrs Josanne Paris                ActingClerk to the House                 Houseof Representatives
14.01 to 23.01.2015
of Representatives                               Parliament of Malta
16 Jannar 2015

No. 35

NOTARIAL PROFESSION AND NOTARIAL ARCHIVES ACT

CAP. 55

Appointment of Notary Delegate/Keeper
It ishereby notified that in exercise of the powers conferred by Article 20 of theNotarial Profession and Notarial Archives Act, the Court of Revision ofNotarial Acts has appointed Notary Dr Maria Roberta Mamo to be Notary Delegate andKeeper of the Acts for Notary Dr Paula Mamo, for the period between the 7th andthe 11th January, 2015.
Today, 8th January, 2015.
JANET CALLEJA
For the Registrar, Courtof Revision of Notarial Acts

No. 36

CODE OF ORGANIZATION AND CIVIL PROCEDURE

CAP. 12

OfficialCurators and Advocates for Legal Aid
It isnotified for general information that Dr Victor J. Bugeja, LLD, has beenappointed Official Curator and Advocate for Legal Aid (Malta), for the periodbetween 13th January, 2015, and 12th January, 2016.
14 Jannar 2015

No. 37

MALTA ENVIRONMENT AND PLANNING AUTHORITY

Notificationof Exemption of Environmental Planning Statement
Inconformity with Regulation 3(8) of the Environmental Impact AssessmentRegulations (Legal Notice 114 of 2007), and in view of the fact that MEPA hasdetermined that the proposal is unlikely to have significant environmentalimpacts, the Director of Environment Protection agrees that the proposal doesnot require the preparation of an Environmental Planning Statement (EPS). 
The ProjectDescription Statement (PDS) presented as part of the application has consideredthe environmental issues in a sufficient manner such that the preparation of anEPS would not add any new information and MEPA has all the necessary informationto determine the application. From the information presented in the PDS andscreening according to Schedule IB of the same Regulations, the proposal is notlikely to have significant environmental effects.
A detailed justification is presentedbelow:
Reference Number:PA05501/08
Location: Site at Ta’Alla u Ommu, Wied Filep, Limits of Naxxar
Proposal: Masterplanfor the relocation of plant from Quarry 15
The followingpotential environmental impacts were identified and mitigation measures proposedin the Project Description Statement (PDS) submitted to MEPA on the 20thOctober 2014 and the justification for proposal from carrying out anEnvironmental Impact Assessment (EIA) submitted on 20th November 2014.
Notwithstanding the above, the MaltaEnvironmental and Planning Authority reserve the right to request the applicantto submit additional information as may be necessary to determine theapplication.  
Potential Impacts
Remarks on mitigation measures, etc.
Waste generation
The project will generate waste during both construction and operation. Inert waste generated during the construction phase is not considered to be significant. During operation, activities on site are not expected to generate significant amounts of municipal waste. Any hazardous waste will be treated or disposed of in accordance with the hazardous waste consignment permit.
Impact on air quality
During construction, fugitive dust from site clearance and excavation, and Nitrogen Oxide (NOx) emissions from construction vehicles are expected. However, no significant impact is envisaged given that that there are no particular sensitive receptors in the area of influence of the development and as long as the Environmental Management Construction Site Regulations (Legal Notice 295 of 2007) are adhered to. During operation, dust will be generated during plant operation and from traffic. Dust generation during operation can be sufficiently abated through proper plant design, adequate waste management and other measures which could be managed through an operational permit. Nitrogen Oxide (NOx) from operational traffic is not expected to be significant.
Noise and vibrations
Noise and vibration during construction are expected to be limited to those typically associated with normal construction site activities. During operations, noise and vibration are expected from the various machines within proposed plant (stone crusher, batching plant). However, these will not present any particular impact over and above the currently existing situation in the surrounding area. Furthermore, such impact can be mitigated sufficiently through proper plant design and through measures which could be managed by means of an operational permit.
Water Quality
The site is situated within a Drinking-Water Safeguard Zone and adjacent to Wied il-Għasel valley system. The project may further increase the risk of contamination of water through the potential release of contaminated waters into the surrounding valley system. Therefore, appropriate design and operational measures should ensure that there are no risks of land or water contamination from the release of pollutants.
Impact on cultural
heritage
Although the site and its entire surrounding area have been subjected to extensive disturbance, there is a possibility of archaeological remains being uncovered. Thus consultation with the Superintendence of Cultural Heritage (SCH) is required especially regarding monitoring of on-site works.
Light pollution
During night time, light emissions above the current baseline situation are expected. Nevertheless, these may be reduced through the use of down-lighters and minimisation of nocturnal lighting.
16 Jannar 2015

No. 38

MALTA ENVIRONMENT AND PLANNING AUTHORITY

Notificationof Exemption of Environmental Planning Statement
Inconformity with Regulation 3(8) of the Environmental Impact AssessmentRegulations (Legal Notice 114 of 2007), and in view of the fact that MEPA hasdetermined that the proposal is unlikely to have significant environmentalimpacts, the Director of Environment Protection agrees that the proposal doesnot require the preparation of an Environmental Planning Statement (EPS). 
The ProjectDescription Statement (PDS) presented as part of the application has consideredthe environmental issues in a sufficient manner such that the preparation of anEPS would not add any new information and MEPA has all the necessaryinformation to determine the application. From the information presented in thePDS and screening according to Schedule IB of the same Regulations, theproposal is not likely to have significant environmental effects.
A detailed justification is presentedbelow:
Reference Number: PA04241/08
Location: Quarry No.81, Triq Ta’ Wied Ħanzir, Siġġiewi
Proposal: Extensionto existing quarry
Reference Number: PA04242/08
Location: Quarry No.71, Triq Għal Għar Ħanzir, Siġġiewi
Proposal: Extensionto existing quarry
The following potential environmental concernswere identified and mitigation measures proposed in the Project DescriptionStatement (PDS) submitted to MEPA on the 3rd July 2009, and the 4th April 2010and the justification for proposal from carrying out a limited EnvironmentalImpact Assessment (EIA) submitted on 20th December 2010.
Notwithstanding the above, the MaltaEnvironmental and Planning Authority reserve the right to request the applicantto submit additional information as may be necessary to determine theapplication.  
Potential Impacts
Remarks on mitigation measures, etc.
Water Quality
No significant impacts are envisaged, and the proper management of potential pollutants (e.g. oils) in accordance with statutory procedures is expected to be sufficient to minimise effects on the environment and on groundwater. This aspect will be enforced through the environmental permitting mechanism.
Air quality, including
dust
Practical measures shall be undertaken to mitigate dust dispersion.  Standard mitigation measures will be implemented to limit any impacts.
Waste
Waste to be generated by the proposed development is considered to be minimal, however most of the material arising from the quarrying activities would be crushed and recycled at the crusher in another quarry and not heaped on site.
Noise and Vibration
The proposed works will be located within an area recognisant of quarry activity, and thus significant noise and vibrations are not envisaged. Noise abatement measures in accordance with the Environmental Management Construction Site Regulations, 2007 (L.N. 295 of 2007) shall further minimise any impacts.
16 Jannar 2015

No. 39

MALTA ENVIRONMENT AND PLANNING AUTHORITY

Notificationof Exemption of Environmental Planning Statement
Inconformity with Regulation 3(8) of the Environmental Impact AssessmentRegulations (Legal Notice 114 of 2007), and in view of the fact that MEPA hasdetermined that the proposal is unlikely to have significant environmentalimpacts, the Director of Environment Protection agrees that the proposal doesnot require the preparation of an Environmental Planning Statement (EPS). 
The ProjectDescription Statement (PDS) presented as part of the application has consideredthe environmental issues in a sufficient manner such that the preparation of anEPS would not add any new information and MEPA has all the necessaryinformation to determine the application. From the information presented in thePDS and screening according to Schedule IB of the same Regulations, the proposalis not likely to have significant environmental effects.
A detailed justification is presentedbelow:
Reference Number:             TRK156777
Location:              Field in Triq Bieb ir-Ruwa,Tal-Ħafa, Fiddien, Rabat, Malta
Proposal:               Construction of greenhousesincluding South facing integrated solar panels cladding and construction of atool room, substation and underground water reservoir.
The followingpotential environmental impacts were identified and mitigation measuresproposed in the Project Description Statement (PDS) submitted to MEPA on the30th October 2014 and the justification for proposal from carrying out anEnvironmental Impact Assessment (EIA) submitted on 5th December 2014.
Notwithstanding the above, the MaltaEnvironmental and Planning Authority reserve the right to request the applicantto submit additional information as may be necessary to determine theapplication.  
Potential Impacts
Remarks on mitigation measures, etc.
Waste generation
The amount of solid waste likely to be generated by the project during both construction and operation is not likely to be significant considering the nature of the project.
Air quality, noise and
vibration impacts
During construction, emissions are not expected to be significant.  Noise, vibrations, and dust-related impacts during construction are temporary and can be mitigated through the application of mitigation measures as identified in the Environmental Management Construction Site Regulations (Legal Notice 295 of 2007).
Visual Impact
No significant visual impacts are expected given that visual impact is being mitigated through a landscaping proposal.
Light pollution
During night-time, light emissions above the current baseline situation are expected. Nevertheless, these may be reduced through the use of down-lighters and minimisation of nocturnal lighting.
16 Jannar 2015

No. 40

GOLDSMITHS AND SILVERSMITHS ACT

CAP. 46

THE Commissioner of Inland Revenuenotifies that on the date shown hereunder, the price of gold and silver onwhich valuations made by the Consuls for Goldsmiths and Silversmiths are basedhas been fixed for the purposes of article 14 of the said Act as follows:–
Date                                   PureGold                                     PureSilver
                                                Grams                                            Grams
16.1.2015                            €33.857                                          €0.484
16 Jannar 2015